The MSRC Project - Interbay Moorings Commercial Marine

 

 

 

 

 

The MSRC is a 48 foot ocean going oil recovery vessel used to service petroleum spill and recovery. Interbay Moorings Commercial Division was selected to haul, block and prepare to sand blast original rubber based anti-fouling coating. The  entire haul, (up to waterline), was sand blasted and new anti-fouling zinc-chromate primer, epoxy and paint was applied.

 

 

The MSRC is hauled with the IBM 70 Ton lift                Over 25,000 pounds of sand being unloaded and prepared for use.

Sand blasting begins

The old black anti-fouling compound slowly being removed

Sand blasting completed the first coats of primer are applied

The completed running gear with new zincs and multiple coats of zinc-chromate anti-fouling paint

The MSRC makes its way back to the water in the lift

Billy and Steve get ready to place the MSRC in the "Well"!

A job well done!